Stamped record
Quarterly graded record
First graded quarter: Q3 2026, grading after 16 Nov 2026.
The Q3 2026 next-buy predictions were frozen as of 30 Sep 2026 and sealed on 15 Oct 2026, 20:05 UTC, before managers file their Q3 2026 13F reports (due 16 Nov 2026). Stamp hash (SHA-256 of the sealed manifest): 4379b66f1a9a66989d7c948ae8392ba9e13de1a0656e18d86732695c77586031. The hash was submitted to OpenTimestamps on 15 Oct 2026. The manifest is published with the grade, so anyone can check that it hashes to the value above.
Timestamped calls are graded against later filings; the stamp precedes the outcome.
The record covers 2026-07-07 to 2026-10-14. It contains 70 distinct calls. Each call met the exported P(add) threshold of 60% before it was stamped.
| Register | Stamped | Scored | Hits | Rate | Base rate | Maturity days |
|---|---|---|---|---|---|---|
| Hong Kong | 2 | 2 | 0 | below the floor of 10, no rate stated | 0.0% | 7 |
| Japan | 26 | 22 | 4 | 18.2% | 3.5% | 7 |
| Korea | 23 | 23 | 0 | 0.0% | 0.0% | 22 |
| United Kingdom | 19 | 18 | 0 | 0.0% | 0.0% | 16 |
Withheld
hk: 0 scored, below the floor of 10, so no rate is stated. no unscored calls to recover.
jp: 0 scored, below the floor of 10, so no rate is stated. 12 with no prior universe (panel starts 2020-01-27); 3 filer(s) unmapped to the panel
kr: 0 scored, below the floor of 10, so no rate is stated. 8 with no prior universe (panel starts 2024-01-02)
uk: 0 scored, below the floor of 10, so no rate is stated. 1 with no prior universe (panel starts 2017-06-12); 1 filer(s) unmapped to the panel
How to check
Download commit_2026-10-17.json and commit_2026-10-17.json.ots from the public repository. Run shasum -a 256 commit_2026-10-17.jsonand compare it with 0645f9b5e4caf55f4e62e1a87baaa7c770801c070b6eb2b98809b0362a16a929, then run ots verify commit_2026-10-17.json.ots.